Engineering Management Department

More ...

About Engineering Management Department

Facts about Engineering Management Department

We are proud of what we offer to the world and the community

27

Publications

Publications

Some of publications in Engineering Management Department

Managing Change of Project in”Oil Industrial Sector"

Abstract The success of projects are depends on the people involve and how they tackle the design of the projects for specific needs, planning of activities, budget cost and execution to achieve the ultimate goal. Each phase of the project contributes an important task and this will reflect on how good the project management handled by the team.Project management means managing all the relevant activities of the project within the given constraints of time and cost, however , to complete specified project as per schedule and within the allocated budget, an accurate planning and optimization of all available resources will be required to complete all the tasks.During the projects, changes can occur even though the original scope may have been carefully planned. These changes might occur at any times and in ways that are unexpected.Changes during project execution can significantly affect not only time schedule but may affect also the economical aspect of the project. This phenomenon can be considered as normal and experienced world wide especially in the third world countries wherein lack of technical knowledge and resources are major problems.This study concerns the majority of the managerial changes occurred during the project execution step and the role of the organization in handling such changes as competitive and finding solutions in order to manage the project effectively.Many oil companies in Libya were facing numerous problems in the delay of project implementation, poor quality management, planning and poor performance which deviate from the required project objectives. Changes that occur later in the implementation cause serious problems in delaying the project schedule and increasing costs, effectively are reducing the benefits of the project.By Appling the questionnaire that consists of 30 specific questions which have been distributed to 13 Companies under umbrella of National Oil Corporation (N.O.C). Eight out of thirteen companies were responded.The analysis of the data collected from submitted questionnaire has been analyzed using Microsoft Excel 2000. That allows simple setting and manipulation of the data collected.Statistical data and interviews on the respondent companies indicate the following items: Full dependency on the external contractors to fully execute the project implementation that leads to high cost of contracts (EPC contracts).Poor supervision leading to significant delay of the implementation of the project. (Specifically of E P contracts).The Project Implementation profile (PIP technique) has been used on this study to evaluate one of the project which had delay and some other related problems selected random as case study. The analysis covered all the factors for project implementation. Technical factor.Managerial factors.Controlling factors. In order to improve the project management for oil & gas companies listed in this research and to overcome such problems. This study recommends a good communication and coordination system connecting all local petroleum companies and providing data exchange which enables to minimize time, cost personnel and learn from mistakes.
زينب مختار المصري (2007)
Publisher's website

دراسة اداء ادارتي المشتريات والمخازن بالمؤسسات الليبية

من المعروف أن نشاطي الشراء والتخزين ركنان اساسيان من اركان عمليات المؤسسات التجارية أو الصناعية أو الخدمية، وذلك نظراً لضخامة المواد المطلوبة في صناعة وتجارة اليوم. لذا أصبح من الضروري الاهتمام الكافي بهذان النشاطان، ولهذا السبب كانت فكرة هذه الدراسة. في هذه البحث تم تغطية الإطار النظري بمواضيع تشمل إدارة المشتريات وإدارة المخازن، يلي ذلك الإطار التطبيقي المتمثل في الدراسة الميدانية بجمع المعلومات من ثلاث مؤسسات ليبية كبيرة متنوعة المجالات، كعينة على المؤسسات الليبية، وهذه المؤسسات هي الشركة العامة للكهرباء، وشركة مليته للنفط والغاز، والشركة العامة للنقل البحري. كذلك تم إجراء دراسة إستبيانية بتوزيع استبيان لإدارة المشتريات وآخر لإدارة المخازن على عينة عشوائية لكل من هذه المؤسسات. ومن خلال النتائج المتحصل عليها من هذه الدراسة (البحث)، توصلت الباحثة لعدة استنتاجات عن اداء ادارتي المشتريات والمخازن في المؤسسات الليبية، ومن هذه الاستنتاجات انبثقت مجموعة من التوصيات التي تعتقد بان إتباعها قد يساهم في انجاح اداء ادارتي المشتريات والمخازن، وبالتالي انجاح ادارة حركة المواد في المؤسسات الليبية. ومن خلال هذه الدراسة، تم التوصل الى تصميم نموذج قدمته كمقترح لإدارتي المشتريات والمخازن، والتي تشمل طريقة الشراء والتخزين والفحص والصرف، وتم كذلك اقتراح نموذج لهيكل تنظيمي يتبع الاسلوب العلمي المطور لإدارتي المشتريات والمخازن.وترى الباحثة في هذا المقترح، ضرورة جمع إدارة المشتريات وإدارة المخازن في إدارة واحدة، يرأسها مدير واحد يتبع مدير الشؤون التجارية والمالية، يطلق عليها إدارة المواد. وينتج من دمج المشتريات والمخازن، ومراقبة المخزون في إدارة واحدة، مجموعة من المزايا غير متواجدة في النماذج الموجودة في المؤسسات الليبية تحت الدراسة. ونتيجة لان نشاطي الشراء والتخزين يعتبران نشاطان خدميان مهما اختلف تخصص المؤسسة التابعان لها، سواء كانت هذه المؤسسة إنتاجية صناعية أو تجارية أو خدمية، فان هذا المقترح من الممكن استخدامه في مختلف المؤسسات الليبية.وباعتقاد الباحثة بان هذا المقترح المقدم سيساعد في مراقبة حركة المواد، لأنه يربط المخازن بالمشتريات في مستنديه واحدة، ومن خلاله لا يتم الشراء إلا بعد التأكد من عدم وجود المواد بالمخازن، وبالتالي يمنع تكدس المواد وازدواجية الطلبيات. ايضا فإن هذا المقترح يجعل عملية الدفع مؤجلة حتى وصول المواد للمخازن وفحصها فنياً، وعند التأكد من سلامتها ومطابقتها للمواصفات، عندها فقط يتم الدفع وهذا يمنع تكدس المواد الغير مطابقة للمواصفات في المخازن ويحد من خسائر الشركة. Abstract It is well known that the purchase and storage activities are considered to be the fundamental pillars of the business, commercial, industrial or service operations, due to the magnitude of the required materials in the manufacture and trade of the day. So it became necessary to give adequate attention to these activities, and that’s why the researcher had thought of the idea of this research.In this research, the theoretical framework covering topics include procurement (purchasing) management and warehouse (inventory and storage) management; followed by a practical framework of the field study to collect information from the work of three large Libyan institutions in a variety of fields, namely, the General Electric Company, Mellitah Oil and Gas Company, and the General Company for Maritime Transport, as a sample of the Libyan institutions. Also, the study includes the distribution of questionnaires to procurement management and warehouses management on a random sample of each of these institutions.Through the obtained results from this study (research), the researcher reached several conclusions about the performance of the management of procurement and warehouses in the Libyan institutions and these conclusions emerged a set of recommendations. It is believed that if these recommendations were followed, then they may contribute to the success of the performance of the management of procurement and warehouses, and consequently to the success of the management of movement of materials in the Libyan institutions.An important model design presented as a proposal for the management of procurement and warehouses has been reached, which include a method for purchases, storages, inspection, and payment. Also an organization structure model was proposed that follows the advanced scientific method to manage the procurement and warehouse. Since the purchases and the warehouses are considered two service activities; then no matter what type of activity the institution is following; whether it is an industrial productivity, commercial or service, this proposal could be implemented in various Libyan institutions.The researcher beliefs that this proposed model will help in monitoring the movement of materials, it connects warehouses with purchases in just one documentary, and through it, purchase is only allowed after making sure that there are no materials in the warehouses, and thus prevents the accumulation of materials and duplication orders. Also, this proposal makes payment deferred until the arrival of materials to warehouses and technically inspected; when you confirm the safety and compliance with the specifications, only then the payment is made, and this prevents the accumulation of non-matching material to the specifications in the warehouses and reduces the company's losses.
سيناء يوسف السويحلي (2014)
Publisher's website

A Study to Develop a Model for the Corrosion Risk Assessment in Crude Oil Storage Tanks

المعدات الصناعية المختلفة مثل المستوعبات المضغوطة و الخزانات تكون عرضة للتآكل مع الزمن, و بالتالي فإن سعتها التشغيلية تنخفض مع الزمن مع زيادة معدل الخطر الناجم من التآكل المتزايد في هذه المنشئات. هذه الدراسة تسعى إلى تطبيق تقنيات تقييم المخاطر في برنامج الكشف على التآكل في الخزانات العلوية ذات الضغط الجوي المستخدمة لتخزين النفط,حيث أن هذه الخزانات هي مصدر للخطر بسبب محتواها من المواد الخطرة. تعتمد الدراسة تقنية تقييم مخاطر التآكل في برنامج الكشف على التآكل في الخزانات العلوية ذات الضغط الجوي في مصفاة شركة الزاوية للتكرير. إن هذه الدراسة تعتني بتطوير نموذج منطقي يوضح الإجراءات التنفيذية لتقييم مخاطر التآكل, لهذا تم الاعتماد على مصادر مختلفة للبيانات مثل بيانات الكشف والمقابلات مع الخبراء و المشغلين و كذلك الزيارات الحقلية لغرض تنفيذ دراسة فعلية. لتحليل بعض أنواع البيانات المتحصل عليه تم استخدام تقنية التحليل الهرمي وتم اعتماد ستة أنواع من التآكل كمصدر للخطر بالخزانات في المصفاة حيث كانت من الأسباب الرئيسية لتهالك الخزانات. لتقدير نتائج المخاطر من التآكل تم اعتماد معايير محددة و هي التأثير على البيئة و الإصابات البشرية والتأثير على تكاليف الإنتاج و كذلك على زمن الإنتاج. أظهرت النتائج أن التآكل الداخلي المنتظم في الطبقة الأولى من جدار الخزان له أعلى قيمة نسبية من نتائج الخطر بينما التآكل الموضعي في منبسط السلم السقفي المتدحرج و مسامير الدرجات له أقل قيمة نسبية من نتائج الخطر. الترجيح النسبي للحوادث من التآكل كان الأعلى احتمالاً في أنابيب منظومة الإطفاء (6.4%) و الأقل احتمالا في مسند سلم الجدار (2.9%). لاحقاً, تم بناء مصفوفة المخاطر من التآكل بغرض تلخيص و توضيح نتائج المخاطر النسبي مقابل الترجيح النسبي لحدوث الخطر الناتج عن التآكل. أعلى قيمة نسبيه للخطر تم تقديرها بسبب التآكل الموضعي في صفائح قاعدة الخزان و وأدنى قيمة نسبيه للخطر وجدت بسبب التآكل الخارجي المنتظم في صفائح أرضية السقف و كذلك بسبب التآكل الموضعي في مسامير الدرجات بالسلم السقفي المتدحرج. أخيراً تم إنتاج نموذج سهل الفهم لتقيم المخاطر من التآكل لإظهار أسلوب منطقي و واضح يمكن إتباعه وتطبيقه. Abstract: Industrial equipment such as pressure vessels and storage tanks are deteriorating by corrosion with time. Consequently the carrying capacity diminishes with time while the level of risk of these structures increases. This study seeks to apply the Risk Assessment techniques on corrosion inspection program in the Above ground atmospheric storage tanks, where the storage tanks are potentially hazardous due to the substances they contain. This study applies corrosion risk assessment techniques to the inspection program of above ground storage tanks in azzawiya oil company refinery.The study intends to develop a logical model for the confirmation of corrosion risk assessment procedure. Various data sources such as inspection data, expert and operational people interview and field surveys have been utilized for study execution. For data analyses, the analytical hierarchy process has been applied. Six types of corrosion risk sources have been identified as the cause of tank deterioration. For the evaluation of corrosion risk consequences criteria were chosen anomaly, environment impact, human casualty, production cost and production time. The results show that the internal uniform corrosion of the first course of tank shell has the highest relative consequence value whereas the localize corrosion of roof rolling ladder platform and stair bolts have the lowest relative consequence value. The relatively likelihood of corrosion incidence was most probable in firefighting tubs (6.4%) and was lowest in shell ladder handrail (2.9%). Finally, corrosion risk matrix has been constructed to summarize the relative consequences against likelihood of occurrence. The highest relative risk value was found from the localized corrosion in sketch plates, and the lowest relative risk value was found from the external uniform corrosion in roof deck plates and localized corrosion in stairs bolts of roof rolling ladder. An understandable Corrosion Risk Assessment model was produced in order to presenting a clear logical direct path to follow.
أشرف الزيات (2010)
Publisher's website